Why Conventional Renovation Takes Weeks
Drywall requires 7 sequential operations with drying time: framing → boarding → joint tape → skim coat ×2 → sanding → primer → painting ×2. Total: 7–14 days + deep cleaning from gypsum dust.
5 Stages of LuxeSpan Installation
1. Survey (Before Installation)
Our engineer visits with samples, takes precise measurements, and provides a final quote. The price is locked in the contract.
2. Manufacturing — 48 Hours
The membrane is custom-cut to your exact room dimensions.
3. Profile Mounting (2–3 Hours)
Aluminium guide rails around the perimeter. Light fixture platforms. All drilling with industrial dust extraction.
4. Membrane Stretching (1–2 Hours)
The membrane is secured in the profile and stretched to a perfectly level plane. Light fixtures installed.
5. Final Inspection
You inspect the quality. Payment only after your approval.
Timing by Room Type
| Space | Time |
|---|---|
| Single room (up to 25 m²) | 3–4 hours |
| Studio apartment (30–50 m²) | 6–8 hours |
| 2–3 bedroom apartment | 1–2 days |
| House (100+ m²) | 2–3 days |
Why "Dust-Free" Is Not a Marketing Gimmick
With drywall, dust is generated at 3 stages: cutting, sanding skim coat, sanding before painting. With a stretch ceiling — only fastener drilling. Our hammer drill with dust collector captures 95%+ of dust.
After we finish, no deep cleaning is needed — a light damp wipe is sufficient.
Can You Stay in the Apartment?
Yes. Furniture doesn't need to be removed — just moved 50–60 cm from the walls. We cover furniture with protective film. After installation, the space is immediately ready for living.